The two containerised server rooms at Site One require one of these service containers for cooling and power, as well as connections to diesel generators for emergency power. The cooling pack contains two UPS systems, one of which can carry the customer’s 100mW load with still 20 percent capacity to spare, the other to provide redundancy.