Six of the diesel rotary uninterruptible power supply (DRUPS) units have been installed, with the other seven to be put in place over the coming months. In the event of a power cut, it would take 72,000 litres of diesel fuel to run the generators for 24 hours, in addition to 750,000 litres of water required for the chillers.