iTnews
  • Home
  • News
  • Technology
  • Networking

CERN to double capacity with Budapest data centre

By Brett Winterford
Aug 3 2012 7:00AM
Follow google news

Power constrains Large Hadron Collider facility.

CERN is building a new data centre in Budapest, Hungary in an attempt to dramatically improve the compute resources available to particle physics experiments at the Large Hadron Collider (LHC).

CERN to double capacity with Budapest data centre
Linked gallery: Photos: The data centre behind CERN's LHC

The European organisation went to tender for a second 'Tier Zero' data centre after finding that its 1970s-era, 3.4 MW facility in Geneva, Switzerland was hitting capacity contraints.

It decided in May to build the new facility at the Wigner Research Centre for Physics in Budapest.

CERN operates the $6.3 billion LHC on the border of Switzerland and France, with a budget of about $164 million for IT equipment and labour over the life of the LHC's six experiments.

The experiments – including ATLAS and CMS, which famously announced the discovery of a "particle consistent with the Higgs Boson" last month – generate about one petabyte of data a second.

Of that, only about 700 megabits a second is committed to storage and/or processing at CERN’s on-site, 'Tier Zero' data centre.

The Tier Zero facility is the central hub of the Worldwide LHC Computing Grid, which also connects to some dozen ‘Tier One’ data centres for near-real time storage and analysis of data and over 150 ‘Tier Two’ data centres for batch analysis of experiment data.

Despite several decades of renovations and an ability to share resources across a globally distributed grid, Tier Zero in Geneva has in recent years been limited by the availability of power.

CERN’s activities use 230 MW of power, 120 MW of which is reserved specifically for the Large Hadron Collider. The CERN data centre uses 3.4 MW and is at full capacity.

“That means that essentially we can't put more equipment in there,” explained David Foster, deputy head of IT at CERN. “We are pushing more jobs to Tier One and Two data centres.”

Foster said CERN intended to "work towards doubling our capability" with the new Budapest facility, which would feature four computer rooms providing an additional 2.5 MW, with headroom to grow to about 5 MW.

This second Tier Zero facility will operate in lockstep with CERN’s Geneva data centre. From a technical perspective, the infrastructure deployed in it will be a logical extension of the existing architecture.

Wigner will manage the physical building, whilst the IT infrastructure deployed in the facility will be virtualised and managed remotely from the CERN’s Geneva control room.

All four rooms at the Hungary facility are expected to be complete by June 2013. The first of the rooms will be online by the end of this year.

Add iTnews as your trusted source

Add iTnews As Your Trusted Source Add iTnews As Your Trusted Source
Got a news tip for our journalists? Share it with us anonymously here.
Copyright © iTnews.com.au . All rights reserved.
Tags:
cerndata centredatacenterlarge hadron colliderlhcnetworkingscitech

Related Articles

  • Nokia wins UK appeal to block Acer, Asus video streaming patent lawsuits Nokia wins UK appeal to block Acer, Asus video streaming patent lawsuits
  • Australian Federal Police sign $20.5m Cisco deal Australian Federal Police sign $20.5m Cisco deal
  • Wireless Broadband Alliance claims wi-fi security on a par with cellular Wireless Broadband Alliance claims wi-fi security on a par with cellular
  • FBI remotely patched privately-owned routers to evict Russian GRU spies FBI remotely patched privately-owned routers to evict Russian GRU spies
Join our WhatsApp Channel

Partner Content

Take control of your connectivity with Telstra’s Adaptive Networks Centre
Partner Content Take control of your connectivity with Telstra’s Adaptive Networks Centre
Scalable AI solutions: secure delivery
Scalable AI solutions: secure delivery
Thomas Peer Solutions unveils data cloud platform and executive leadership forum for 2026
Partner Content Thomas Peer Solutions unveils data cloud platform and executive leadership forum for 2026
The hidden economics of AI: Why token usage matters more than you think
Partner Content The hidden economics of AI: Why token usage matters more than you think

Sponsored Whitepapers

Agile in the AI Era: why projects still fail
Agile in the AI Era: why projects still fail
When Technology Becomes the Blocker: Unlocking Real Outcomes from AI and Cloud
When Technology Becomes the Blocker: Unlocking Real Outcomes from AI and Cloud
High-volume data sources for AI-driven security analytics
High-volume data sources for AI-driven security analytics
How healthcare organisations can get more value from cloud
How healthcare organisations can get more value from cloud
1 in 3 companies lose SaaS data. Here’s how to prevent it
1 in 3 companies lose SaaS data. Here’s how to prevent it

Events

  • iTnews State of Security Breakfast iTnews State of Security Breakfast
  • iTnews State of Data & AI Breakfast iTnews State of Data & AI Breakfast
  • The 2026 iAwards The 2026 iAwards
  • Integrate 2026 Integrate 2026
  • Security Exhibition & Conference Security Exhibition & Conference
Share on Facebook Share on LinkedIn Share on Whatsapp Email A Friend

Most Read Articles

WA man jailed for at least five years for evil twin attack

WA man jailed for at least five years for evil twin attack

Optus fast-tracks network operations insourcing from Nokia

Optus fast-tracks network operations insourcing from Nokia

The Asus ZenWiFi Pro XT12 delivers fast, reliable wireless networking for SMBs

The Asus ZenWiFi Pro XT12 delivers fast, reliable wireless networking for SMBs

Australia Post deploys ThousandEyes across its retail network

Australia Post deploys ThousandEyes across its retail network

techpartner.news logo
Sydney-based AI-cloud waste startup raises $3m
Sydney-based AI-cloud waste startup raises $3m
Brennan uses NiCE to modernise its contact centre
Brennan uses NiCE to modernise its contact centre
Impact Awards: Tecala slashes customer response times for fintech IQumulate
Impact Awards: Tecala slashes customer response times for fintech IQumulate
Interactive introduces private cloud platform
Interactive introduces private cloud platform
Digital61 expands cybersecurity portfolio
Digital61 expands cybersecurity portfolio
All rights reserved. This material may not be published, broadcast, rewritten or redistributed in any form without prior authorisation.
Your use of this website constitutes acceptance of nextmedia's Privacy Policy and Terms & Conditions.