iTnews
  • Home
  • News
  • Technology
  • Networking

Global Switch in high gear for Level 7 fitout

By Ry Crozier
May 23 2011 6:07AM
Follow google news

Stulz CRACs support higher density suites.

Global Switch has revealed it has almost completed the fitout of level 7 of its Sydney data centre.

Global Switch in high gear for Level 7 fitout

Project Manager Andrew Ball told iTnews that the fitout had been completed in stages with the "final handover" due in about March 2012.

When completed, Global Switch intends for level 7 to house four suites and a combined total of approximately 4,000 square metres of technical floor space (i.e. excluding plant).

Level 7 was different to other floors in the flagship facility because it supported average floor densities per square that were between 10 and 15 percent higher than on lower floors.

It was also the first floor in the building to use chilled water computer room air conditioning (CRAC) units made by Stulz.

"There's a relatively high power density in the suites, to the point where we needed [CRAC] units to provide maximum cooling for that scenario," Ball said.

"The Stulz unit provided the greatest cooling capacity for its footprint. The ratio of space versus cooling capacity was quite favourable."

Global Switch had bought 63 ASD1600 CyberAir 2 CWU precision units from Stulz.

Each unit had to support a cooling capacity of 114 kW, but was rated by the manufacturer to perform at up to 165 kW, according to a product brochure [pdf].

The buy was partly influenced by "favourable results" from a study of the technology in Global Switch's Paris2 data centre (launching later this year).

Stulz units have also been installed in Global Switch's Singapore data centre; however, level 7 Sydney was the first time the technology had been used by the data centre operator locally.

Specialist equipment placement contractors were brought in to maneuver the CRAC units into position on the floor. The units were able to be transported to level 7 using an internal goods lift.

Ball said the placement didn't involve a lot of resources, but connecting the CRAC units required mechanical engineering and building management system (BMS) skills. Global Switch did not sub-contract fitout work to third parties.

He said Stulz won praise from Global Switch for getting its systems in place within a tight timeframe for the stage one build of level 7.

Major customer wins for Global Switch in the past six months included Department of Defence and NBN Co; however, Ball said he could not reveal whether either was housed on level 7.

Add iTnews as your trusted source

Add iTnews As Your Trusted Source Add iTnews As Your Trusted Source
Got a news tip for our journalists? Share it with us anonymously here.
Copyright © iTnews.com.au . All rights reserved.
Tags:
centercentrecracdatadatacenterdatacentrefitoutglobal switchnetworkingunitswater

Related Articles

  • Federal Parliamentary Computer Network set for its "most significant" upgrade Federal Parliamentary Computer Network set for its "most significant" upgrade
  • Kmart Group to expand RFID tagging to more products and to Target Kmart Group to expand RFID tagging to more products and to Target
  • Nokia wins UK appeal to block Acer, Asus video streaming patent lawsuits Nokia wins UK appeal to block Acer, Asus video streaming patent lawsuits
  • Australian Federal Police sign $20.5m Cisco deal Australian Federal Police sign $20.5m Cisco deal
Join our WhatsApp Channel

Partner Content

AI is delivering business value today
Partner Content AI is delivering business value today
Take control of your connectivity with Telstra’s Adaptive Networks Centre
Partner Content Take control of your connectivity with Telstra’s Adaptive Networks Centre
Thomas Peer Solutions unveils data cloud platform and executive leadership forum for 2026
Partner Content Thomas Peer Solutions unveils data cloud platform and executive leadership forum for 2026
From test case to control tower: How DXC and ServiceNow are governing enterprise AI at scale
Promoted Content From test case to control tower: How DXC and ServiceNow are governing enterprise AI at scale

Sponsored Whitepapers

Are Australian organisations as cyber-ready as they think?
Are Australian organisations as cyber-ready as they think?
Are New Zealand organisations as cyber-ready as they think?
Are New Zealand organisations as cyber-ready as they think?
From visibility to execution:  Fixing the SaaS management gap
From visibility to execution: Fixing the SaaS management gap
When cyber risk has no clear owner: A practical guide for senior Australian business leaders
When cyber risk has no clear owner: A practical guide for senior Australian business leaders
Agile in the AI Era: why projects still fail
Agile in the AI Era: why projects still fail

Events

  • iTnews State of Security Breakfast iTnews State of Security Breakfast
  • iTnews State of Data & AI Breakfast iTnews State of Data & AI Breakfast
  • Forrester's AI Forum Sydney Forrester's AI Forum Sydney
  • The 2026 iAwards The 2026 iAwards
  • Integrate 2026 Integrate 2026
Share on Facebook Share on LinkedIn Share on Whatsapp Email A Friend

Most Read Articles

Kmart Group to expand RFID tagging to more products and to Target

Kmart Group to expand RFID tagging to more products and to Target

Federal Parliamentary Computer Network set for its "most significant" upgrade

Federal Parliamentary Computer Network set for its "most significant" upgrade

WA man jailed for at least five years for evil twin attack

WA man jailed for at least five years for evil twin attack

Optus fast-tracks network operations insourcing from Nokia

Optus fast-tracks network operations insourcing from Nokia

techpartner.news logo
Sydney-based AI-cloud waste startup raises $3m
Sydney-based AI-cloud waste startup raises $3m
Brennan uses NiCE to modernise its contact centre
Brennan uses NiCE to modernise its contact centre
Impact Awards: Tecala slashes customer response times for fintech IQumulate
Impact Awards: Tecala slashes customer response times for fintech IQumulate
Interactive introduces private cloud platform
Interactive introduces private cloud platform
Digital61 expands cybersecurity portfolio
Digital61 expands cybersecurity portfolio
All rights reserved. This material may not be published, broadcast, rewritten or redistributed in any form without prior authorisation.
Your use of this website constitutes acceptance of nextmedia's Privacy Policy and Terms & Conditions.